Dewatering for Basement Construction
12 March 2016Groundwater can be a significant problem when excavating for basement construction. This blog discusses the available techniques that can be used to dewater during basement construction.
Read MoreShallow Well Dewatering
19 January 2016Shallow well dewatering is a technique used for groundwater control and dewatering. This blog discusses the use of shallow suction well pumping on construction dewatering and mine dewatering projects.
Read MoreDewatering for Tunnels and Shafts
3 December 2015Dewatering and groundwater control is often required as part of tunnelling projects. Dealing with groundwater is one of the challenges of working underground. This blog discusses the available techniques that are available for dewatering and groundwater control in shafts and tunnels.
Read MoreArticle on Potential Impacts from Groundwater Control in Urban Areas
7 November 2015Groundwater Engineering recently had an article published in Geodrilling International Magazine on the potential impacts that can result when groundwater control and dewatering is carried out in urban areas.
Read MoreGroundwater Engineering is Proud to Sponsor the GWE Cycling Race Team
12 October 2015Groundwater Engineering is pleased to sponsor the GWE Cycling Race Team, a road and mountain bike racing team based in the north west of England
Read MoreArtificial Recharge for Dewatering Systems
5 October 2015Artificial recharge is sometimes used to dispose of pumped water from groundwater control and dewatering systems. This blog discusses the use of artificial recharge systems on construction dewatering and mine dewatering projects.
Read MoreBlog
Dewatering for Basement Construction
12 March 2016Groundwater can be a significant problem when excavating for basement construction. This blog discusses the available techniques that can be used to dewater during basement construction.
Read More